posted on 2025-07-31, 16:20authored bySam Beddingfield
<p dir="ltr">Part of the B.15 2025 Model Archive, made in 2016.</p><p dir="ltr">This project shows the incremented details of a water drainage system that is integrated into Sam’s building proposal. The drainage features make the building, a theatre, into a spectacle itself during rainstorms which would lead to rain being channelled down the facade through the ducting details as modelled here. Made from layered Grey Board and imitation Gold Leaf.</p>